Raw Mill of Kazakhstan 2nd Line Project Fed with Materials and Put into Operation

Pubdate:2015-08-07

On August 6, for the Kazakhstan Standard Cement 2nd Line 1 MTPA Clinker Production Line Project which is contracted by TCDRI, TRM 36.4 raw mill smoothly achieved load running by one time, and it marks that the 2nd line comprehensively entered into the period of load trial running and commissioning.

 

The smooth load running of raw mill signifies the imminent clinker production. Complete members of the project team will take it as a turning point, further strengthen various preparation works ahead of ignition, and lay the foundation for achieving smooth ignition and production.

 

 

Related Information

 | Contact UsFormer Website | Site Map

Copyright @ 2010 Sinoma International Engineering Co., Ltd. Jing ICP Reference No.: 05020504